Shower Valve Repair
Dripping shower heads, scalding swings and stiff handles fixed at the valve.
Typical $169 to $889The plumbing part of a kitchen or bathroom remodel: moving drains and vents, new supply lines, shower valves, rough in inspection and final fixture set.

We plan with you or your contractor, rough in drains, vents and supplies to the new layout, install shower and tub valves, pass the rough in inspection, then come back to set fixtures once tile and cabinets are in.
Layout, fixture specs and rough in heights are set.
Drains, vents, supplies and valves go in.
City rough in inspection before walls close.
Fixtures set and tested after tile and cabinets.
Crawlspace homes across Virginia Beach make moving a kitchen sink or bath drain easier than in a slab home. In slab homes, we plan drain moves carefully because the concrete has to be opened.

| Typical range | $1,890 to $8,740 |
| Basis | per room, by scope |
| Time on site | 1 to 3 days rough in |
What moves the price: Whether you supply the fixture, the condition of valves and drains behind it, and any changes to the layout.
You get a firm price before work starts. See every range on the prices page.
Yes. We handle the plumbing part and coordinate the schedule.
Within limits. Drain slope and venting set the rules.
Yes for most remodel plumbing, and we pull it.
Dripping shower heads, scalding swings and stiff handles fixed at the valve.
Typical $169 to $889New toilets set level on a sound flange with a new seal and supply line.
Typical $249 to $489Kitchen, bathroom and utility sinks installed with traps, supplies and drains done right.
Typical $219 to $689Replacing old polybutylene, galvanized or failing copper supply lines with PEX or copper.
Typical $6,480 to $15,900Plus the rest of Hampton Roads.
A person answers (757) 505-1910 around the clock, and our own crews cover Virginia Beach and the rest of Hampton Roads.